UNCREWED SYSTEMS – MQ-9B for Canada
The first MQ-9B is scheduled to be delivered in 2028, with full operational capability being achieved between 2030 and 203, and will be based with the Royal Canadian Air Force’s 14 Wing.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed